Skip to main content
+65 6316 8500
Service Menu
News
Resources
Careers
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Vibro compaction
Vibro stone columns
Vibro concrete columns
Dynamic compaction
Dynamic replacement
Rapid impact compaction (RIC)
Dry soil mixing
Mass mixing
Wet soil mixing
Grouting
Cavity grouting
Compaction grouting
Jet grouting
Permeation grouting
Rock / fissure grouting
Deep Foundations
Micropiles
Bored piles
Earth retention
Anchors
Wet soil mixing
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Liquefaction mitigation
Underpinning
Excavation support
Remediation
Seepage control
Stabilisation
Void filling
Tunnelling
Slope stabilisation
Markets
Industrial
Infrastructure
Oil, gas and chemical
Power
Design and build
Projects
How we work
Code of conduct
Values
Health and safety
Diversity and inclusion
Quality
Supporting our women
Sustainability
COVID-19 response
About us
Our leadership
Our commitment
About Keller Group
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Download
Tank farm expansion project summary
Resource
Keller's significant project pre-planning ensured minimization of time lost due to the challenges of working on an island. Working in an operating petrochemical storage facility, Keller completed the project ahead of schedule with zero incidents.
/node/2876
Download
Reclamation for Resorts World Sentosa project summary
Resource
Keller provided cost effective design and build solution to client . Our suitable machine type mobilized, enabling easy movement on site and timely completion
/node/2881
Vibro Compaction for Universal Terminal
Project
/projects/vibro-compaction-universal-terminal
Download
Vibro compaction for Universal Terminal project summary
Resource
Keller completed 200,000m2 of ground improvement up to 35m deep, all within 6 months time.
/node/2891
Nghi Son Petrochemical Refinery Complex
Project
/projects/nghi-son-petrochemical-refinery-complex
Download
Nghi Son petrochemical refinery complex project summary
Resource
Keller employed the Vibro replacement method using Stone columns to treat the area approximately 55,000 square meters, the largest stone column project in Vietnam. The project was completed without major accidents and was 2 weeks ahead of schedule.
/node/2901
Jimah East Coal Fired Power Plant
Project
/projects/jimah-east-coal-fired-power-plant
Lotte Chemical Plant
Project
/projects/lotte-chemical-plant
Download
Jimah East power plant project summary
Resource
Keller effectively dealt with various and unexpected site challenges while successfully completing the work on time with a cost-effective, packaged solution.
/node/2916
Singapore Lube Park
Project
/projects/singapore-lube-park
Download
Lotte chemical plant project summary
Resource
Keller completed piling works in congested live plant with sensitive equipment, live underground utilities and stringent health and safety requirements. The project included deep Micropile installation of up to 48m and Reaction Anchor load test carried out at congested area.
/node/2926
Download
Lube Park project summary
Resource
6 cranes mobilized to accelerate the work program, as Keller provided turnkey design, construction and monitoring package.
/node/2931
Download
Phosphate complex project summary
Resource
Keller designed and built an optimal and cost-effective foundation system while overcoming problems posed by varied and challenging terrain. We also managed an international group of contractors successfully to meet targets and introduced new technologies to the local market – Vibro Concrete…
/node/2936
Download
Tuas Hull Shop project summary
Resource
Keller’s alternative multi-product ground improvement scheme resulted in substantial savings over the conforming driven pile design.
/node/2941
Mediapolis Business Park Development
Project
/projects/mediapolis-business-park-development
Download
Jurong West residential building project summary
Resource
Unexpected highly variable soil and rock strata was drilled while maintaining quality, safety and program requirements. Cavity probing and grouting method helped to reduce the concrete consumption of bored pile installation in the later stage of construction.
/node/2951
Download
Mediapolis business park project summary
Resource
Keller provided packaged solution, including close coordination with all stakeholders and adoption of Polyform guide wall, which saved significant amount of time and accelerated basement construction. The project was also completed ahead of schedule without incidents
/node/2956
Download
Hoa Phat Dung Quat steel complex project summary
Resource
Keller completed the project ahead of schedule with high quality and zero incident. Deep vibro technique was utilized as foundation solution for 14m height iron ore stockpile to limit the allowable settlement and minimize surrounding pile’s lateral movement.
/node/2961
Download
Lhoist lime plant project summary
Resource
Keller provided design and build solution that directly resulted in time and cost savings, executed ground improvement and foundation work in complex soil conditions and successfully transformed marginal land into a valuable production site.
/node/2966
Download
Hong Kong link road project summary
Resource
Keller innovated on our use of equipment to allow limited headroom stone column construction, while complying to stringent airport safety standards.
/node/2971
Show more results