Skip to main content
+65 6316 8500
Service Menu
News
Resources
Careers
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Vibro compaction
Vibro stone columns
Vibro concrete columns
Dynamic compaction
Dynamic replacement
Rapid impact compaction (RIC)
Dry soil mixing
Mass mixing
Wet soil mixing
Grouting
Cavity grouting
Compaction grouting
Jet grouting
Permeation grouting
Rock / fissure grouting
Deep Foundations
Micropiles
Bored piles
Earth retention
Anchors
Wet soil mixing
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Liquefaction mitigation
Underpinning
Excavation support
Remediation
Seepage control
Stabilisation
Void filling
Tunnelling
Slope stabilisation
Markets
Industrial
Infrastructure
Oil, gas and chemical
Power
Design and build
Projects
How we work
Code of conduct
Values
Health and safety
Diversity and inclusion
Quality
Supporting our women
Sustainability
COVID-19 response
About us
Our leadership
Our commitment
About Keller Group
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Puteri Harbour Development
Project
Puteri Harbour Development Our design and build capabilities allowed us to identify and adopt different foundation techniques for different loading conditions, resulting in substantial cost savings…
/projects/puteri-harbour-development
Hoa Phat Dung Quat Steel Complex
Project
Hoa Phat Dung Quat Steel Complex Keller completed the project ahead of schedule with high quality and zero incident. Deep vibro technique was utilized as foundation solution for 14m height iron ore…
/projects/hoa-phat-dung-quat-steel-complex
Fast Track 3A Coal Fired Power Plant
Project
Fast Track 3A Coal Fired Power Plant Keller demonstrated high standards of safe work practices and complied to the stringent safety requirements outlined by the Client. Cost optimization achieved by…
/projects/fast-track-3a-coal-fired-power-plant
Phosphate Complex Foundations
Project
Phosphate Complex Foundations Keller designed and built an optimal and cost-effective foundation system while overcoming problems posed by varied and challenging terrain. We also managed an…
/projects/phosphate-complex-foundations
Tuas Hull Shop
Project
Tuas Hull Shop Keller’s alternative multi-product ground improvement scheme resulted in substantial savings over the conforming driven pile design. Tuas Hull Shop project by Keller in Singapore…
/projects/tuas-hull-shop
Jurong West Residential Building
Project
Jurong West Residential Building Unexpected highly variable soil and rock strata was drilled while maintaining quality, safety and program requirements. Cavity probing and grouting method helped to…
/projects/jurong-west-residential-building
Karimun Petroleum Storage Terminal
Project
Karimun Petroleum Storage Terminal Keller provided design and built solution that generated savings for the client and successfully carried out the work with no incident or injuries. Karimun…
/projects/karimun-petroleum-storage-terminal
Third Klang Bridge
Project
Third Klang Bridge Deep foundation bored pile installations on challenging ground conditions, with piles installed up to 72 m below ground level. Third Klang Bridge project by Keller in Selangor…
/projects/third-klang-bridge
Lhoist Lime Plant
Project
Lhoist Lime Plant Keller provided design and build solution that directly resulted in time and cost savings, executed ground improvement and foundation work in complex soil conditions and…
/projects/lhoist-lime-plant
Hong Kong Link Road
Project
Hong Kong Link Road Keller innovated on our use of equipment to allow limited headroom stone column construction, while complying to stringent airport safety standards. Hong Kong Link Road project…
/projects/hong-kong-link-road
Download
The Colony by Infinitum project summary
Resource
The Colony by Infinitum project summary Construction photo Infosheet Keller's alternative earth retention system accelerated the works and saved significant time for the client Download
/node/2791
Vale Malaysia Iron Ore Facility
Project
Vale Malaysia Iron Ore Facility Keller provided Turnkey Design, construction and monitoring solution, while executing the works within time schedule and with high safety standards. Keller was…
/projects/vale-malaysia-iron-ore-facility
The Colony by Infinitum
Project
The Colony by Infinitum The basement excavation for new development in heart of Kuala Lumpur, Malaysia has significant constructability challenges. Keller's alternative design that created…
/projects/colony-infinitum
Storage Yard at Tanjung Langsat
Project
Storage Yard at Tanjung Langsat Despite challenges faced, Keller completed the work in less than a month. Client was satisfied and commended the good quality of our work and our ability to deliver…
/projects/storage-yard-tanjung-langsat
Tanjung Puteri Reclamation Work
Project
Tanjung Puteri Reclamation Work Keller completed the work in less than three months and overcame the challenges through proper planning, especially the mobilization of machineries. Tanjung Puteri…
/projects/tanjung-puteri-reclamation-work
Download
Vale Malaysia Iron Ore Facility Project Summary
Resource
Vale Malaysia Iron Ore Facility Project Summary Vale Iron Ore facility in operations Infosheet Keller provided Turnkey Design, construction and monitoring solution, while executing the works within…
/node/2816
Download
Storage yard at Tanjung Langsat project summary
Resource
Storage yard at Tanjung Langsat project summary Storage yard superstructure on vibro stone columns Infosheet Despite challenges faced, Keller completed the work in less than a month. Client was…
/node/2826
Download
Foundation of a 6-storey condominium project summary
Resource
Foundation of a 6-storey condominium project summary Soil Mixing in progress Infosheet Keller provided alternative solution to piling that saved time and generated substantial savings for client.…
/node/2831
Download
Yard upgrade works at Bien Dong project summary
Resource
Yard upgrade works at Bien Dong project summary Heavy lifting crane on treated ground Infosheet Keller carried out Vibro replacement works without disturbance to the on-going operations in the yard.…
/node/2836
Download
Tanjung Puteri reclamation works for residential development project summary
Resource
Tanjung Puteri reclamation works for residential development project summary Vibro works in progress Infosheet Keller completed the work in less than three months and overcame the challenges through…
/node/2841
Pagination
Previous page
‹‹
Page 3
Next page
››